Project

  • Panel WTP-MDB 001, Panel WTP MCC, & LCP – Pertamina, Tambun
  • Panel PLC for “PLC System” and “MF & UF” – Pertamina, Tambun
  • PLTG Talang Duku Gas Distribution – Palembang
  • Panel LVMDB, Capacitor Bank, Panel LP01, & LP03 – Palembang
  • MCC – WTS & WWTS Plant- Merak Energy Indonesia, Merak
  • Chlorine Plant Control Panel – Seven Tern De Nora, Singapore
  • CPCP Engineering & Installation – Seven Tern De Nora, Singapore
  • Panel Synchronize Generator 4 x 1000 kVA & Capacitor Bank 1200 kVAR – Departemen
    Keuangan (PUSINTEK PROJECT), Jakarta
  • Panel LVMDB, SDB, MDB & I/O UPS, SR, ER, MR, Integration & Network – Departemen
    Keuangan, Jakarta
  • Panel Synchronize Generator 2 x 200 kVA – ESDM, Ciracas
  • Panel ATS, Automatic Flood Pumps 2 x 45 kW – Jatipinggir, Jakarta
  • Capacitor Bank ALPIVAR 125/100 kVAR – Plaza Semanggi, Jakarta
  • Instrument & Measurement Installation – Ferromas Dinamika, Cikarang
  • Panel of Water Quench & Panel Scrubber – Ferromas Dinamika, Cikarang
  • LCP-WSP-02 – Asahimas Chemical, Cilegon
  • Panel PLC for Granule Plant – Sanova, Tanggerang
  • Panel MDP & Panel SDP – Bali
  • Panel Booster Pump 3 x 37 kW – Kualanamu, Medan
  • Panel MDP, LP Main Office, LP Gudang, & Panel MESS – Makassar